Minimum Energy Efficiency Standards
                          (MEES)

With banks and solicitors no longer willing to accept a poor EPC and tenants getting wise to costs of uprating their building, can you really accept a E rating?

The MEES Headlines

F or G grade

As of the 1st of April 2023 no landlord  shall be able to continue letting a property whose EPC is worse than E,  this is intended to uprate long term tenancies bringing  properties up to current standards.  

April the 1st 2025-2027

From 1st April 2025 EPC's MEES are to rise to the Grade C  for Minimum Energy  Efficiency  Standards,   with enforcement coming into effect as of the 1st of April 2027

2027- 2030 and Net Zero

From 2027 EPC’s are expected to be required to meet a Grade B rating to enable lettings,  legislation shall be enforceable as of 1st of April 2030.
This is in in order to meet our Net Zero commitments, and ending the requirements for MEES to continue. 

First Compliance Window: EPC grade C (2025-2027)

  • 1 April 2025: Landlords of all non-domestic rented buildings in scope of MEES must present a valid EPC.

  • 1 April 2027: All non-domestic rented buildings must have improved the building to an EPC ≥ C, or register a valid exemption.

After 2023, the Government proposes that there should only be four junctures where landlords are expected to comply, and where enforcement activity is required:

At each enforcement date in 2027 and 2030, landlords will need to demonstrate the building has reached the highest EPC band that a cost-effective package of measures can deliver.

Solar Energy
Residential Buildings with Solar Panels
Residential Buildings with Solar Panels

Government Proposals

To deliver net zero, and for the UK to meet its Carbon Budgets, it is vital that these investments are undertaken. The PRS Regulations must be implemented effectively. That is why the following proposals focus explicitly on how the PRS Regulations can be adjusted to ensure they are better aligned with how the industry and local authorities operate in reality, and can be effective at scale.

The proposals are the product of extensive conversations with the sector and the detailed responses received to the 2019 consultation.

Green Energy Turbines

Hows it going to happen?

  • Phased implementation of the EPC Grade B by 2030 requirement, with EPC grade C by 2027 set as an interim milestone

​​

  • The introduction of two-year ‘compliance windows’. The ‘compliance window’ will begin with the requirement for landlords to present a valid EPC. For EPC grade C, Government proposes the compliance window should be 2025-2027, and for EPC grade B 2028-2030

  • A move away from enforcement at the point of let